A simple scheduling problem
Imagine a battery expecting solar generation tomorrow. Charging to 100% overnight at a low price might leave no capacity for midday solar. Conversely, delaying a charge could be risky if tomorrow is overcast. A controller needs to weigh both possibilities.
Reserve and state of charge
Operational policy should set boundaries for minimum reserve, maximum charge and discharge power, and equipment manufacturer constraints. Resilience reserves can be protected separately from capacity available for optimisation.
Forecasts are not measurements
Demand, solar and tariff forecasts inform future decisions; meter readings tell us what actually occurred. Maintaining that distinction makes performance analysis and financial reconciliation more reliable.
Local control comes first
Site-level safeguards, hardware protections and fail-safe behaviour should continue even when external communications fail. WattMesh is designing a separation between device-safe operation and higher-level scheduling.
WattMesh is in development. This page describes intended capabilities and prospective delivery models, not currently certified products, completed installations or guaranteed outcomes. Physical electrical work would be undertaken by appropriately competent and qualified installation partners, subject to project-specific agreements.